![]()
The construction of a grand Ram temple is going on in the Shri Ram Janmabhoomi complex in Ayodhya. 18 temples including Ram Darbar are also being built in the complex. The construction of these temples has gained momentum. A temple of Tulsi Das, the author of Shri Ram Charit Manas, is being built near the Devotee Suvidha Kendra (PFC) building in the temple complex. Its peak was worshiped on Tuesday. Shri Ram Janmabhoomi Trust on Tuesday released pictures of the temples being built in the complex. In which the temples of Maharishis and great men of the Ramayana period are clearly visible. Pictures of all the temples have been taken from three sides, which look amazing. The trust is getting a lift installed for the convenience of the devotees.
The construction of the 161 feet high three-storey Ram temple is planned to be completed by December 2025. The total height from the ground floor to the second floor will be more than 60 feet. In such a situation, so that the devotees do not face any inconvenience in going from the ground floor to the first and second floors, the Ram Mandir Trust is also getting a lift for this. Dr. Anil Mishra, a member of Shri Ram Janmabhoomi Kshetra Trust, said that two lifts are also being built in the west of the temple. One lift will have a capacity of 24 people. A lift with a capacity of six people is also to be constructed in the north direction. The work of the lift will be completed before the anniversary of Pran Pratishtha i.e. 22 January 2025. The trust, which has four thousand workers engaged in the construction work, said, the construction of all the temples is going on at a good pace along with quality. It is estimated that they will be ready within the stipulated time frame. The trust has increased the number of laborers to get the temples being built in the complex completed on time. Now four thousand laborers are working. Champat Rai, general secretary of the Tirtha Kshetra, said, all the construction work is not likely to be completed before December 2025. By the end of 2025, Ram Darbar and 18 temples will be ready in the complex. The number of laborers has been increased. Construction is going on at a fast pace. Around the Ram temple, there is Lord Surya on the south-west corner, Bhagwati on the west-north, Lord Shankar on the north-east, Ganpati temple on the north-west, Hanuman ji in the middle of the south arm and Mata Annapurna temple in the middle of the north arm. Similarly, a temple of Laxman in the form of Sheshavtar, Maharishi Vishwamitra and Maharishi Valmiki, Maharishi Vashishtha, Maharishi August will be established. Apart from this, temples of Mata Shabari, Mata Ahilya and Nishad Raj as well as Goswami Tulsi Das ji are also included. ————————– Read this news too… 68 pilgrimage sites and 19 wells around Hari Mandir in Sambhal: Mention in a book written 350 years ago, the administration is searching for these temples. The dispute in Sambhal was only about Jama Masjid. Now the survey of 68 pilgrimage sites and 19 wells (Koop) from the ancient Kalki temple has also started. There are two big questions in the minds of the people about this. Why is the survey being done? What will happen after the survey? Actually, the district administration of Sambhal wants that the pilgrimage sites and wells should come back into existence. Water harvesting should be done through the wells and ground water should be recharged. The State Archaeological Directorate of Uttar Pradesh is also doing carbon dating of all these places, so that it can be known how old these wells and statues are. Read the full news…
